hollow pots of upper floors

BLD 104 Building Construction Combined Stairs Roof - Scribd

WEEK1: floors 1.1 Functions of floors 1.2 Types of ground floors 1.3/1.4 Method of constructing ground floors. WEEK2: SUSPENDED floors 1.4/1.5 Suspended timber ground floor 1.6 Types of upper floors ? Function of upper floors 1.7 Method of construction of upper floors ? Suspended timber upper floor ? Functions of suspended timber floor. WEEK3: upper floors (CONTINUED) 1.8/1.9 Types of concrete upper floors ? Reinforced concrete upper floors ? hollow pot floor 【Get Price】

General Building Construction 1 - WikiEducator

7 Jan 2009 Contents. [hide]. 1 GENERAL BUILDING CONCTRUCTION II; 2 27.2.01 MODULE UNIT DESCRIPTION. 2.1 PURPOSE; 2.2 SPECIAL REQUIREMENTS. 3 27.2.03 MODULE UNIT SUMMARY AND TIME ALLOCATION; 4 27.2.1 SUB-MODULE UNIT: upper floors; 5 THEORY; 6 PRACTICE; 7 Competences; 8 Reading; 9 Assessment  【Get Price】

Precast Hollow Core Flooring - Croom Concrete

How Does it Work. Slabs are manufactured to differing lengths to accommodate each housing type. These pre-cast slabs are supported by the internal cavity wall and span across the upper floor. Spaces between the slabs are grouted on-site producing a solid structural floor that resists differential movement. Electrical and plumbing services as well as insulation and underfloor heating sit on top of this solid structure, tucked away underneath a screed or timber floor. 【Get Price】

hollow pot upper floor slab - Green Decking For Sale

TYPICAL FLOOR hollow pots SLAB REINFORCEMENT AND pdf. TYPICAL FLOOR hollow pots SLAB REINFORCEMENT AND BEAMS PLAN. 28Y12-13-200 T2. 40Y16-14-200 B2. . . min.150mm above finished floor level. 7. All drainage pipes passing under building and drive way to be encased with 150mm thick concrete sorround. 8. All Inspection Chambers in driveways to. 【Get Price】

An Assessment Of Time Variation In Solid And Hollow Floor

while in construction of reinforced cast in situ concrete hollow slab; formwork construction, placing hollow bricks or blocks or moulds on formwork and curing concrete takes more time than the other processes involved. The study's major recommenda- tion is that, adequate and careful analysis should be conducted before taking a decision on the choice of floor system been adopted for any project. DOI 10.5592/otmcj.2014.1.8. Research paper. Reinforced Concrete,. Solid Slabs, hollow  【Get Price】

How to Choose a Floor Structure Homebuilding & Renovating

27 Jun 2016 Concrete slabs are a good alternative for small extensions (where beam and block floors are uneconomic); Beam and block systems which utilise insulated blocks can provide an even quicker installation; Solutions for first floors include traditional softwood joists, timber I-joists or open metal web joists; the latter hollow core decks are used mainly for upper floors in flats, but are ideal for cantilevered balconies, although cold bridging can be a potential design issue. 【Get Price】

Patent US8028493 - Floor construction method and system - Google

4 Oct 2011 This invention relates to a floor construction method and system, and more particularly to a method for producing shallow and ultra shallow steel floor systems. The floor units may be hollow pot floor units. The floor units may be block and . The upper flange (31) has a smaller width than the lower flange (32), which enables the pre-cast concrete units (34) to be lowered into position on the lower flange (32) without hindrance from the upper flange (31). The pre-cast  【Get Price】

EXETER COLLEGE OXFORD

13 Mar 2013 external brickwork walls supporting floor beams which span between these walls and internal steel columns. The roof and rear elevation has been locally . The upper floor bedrooms, which are arranged around the central corridor, appear to be structurally unaltered from the original construction. However, when constructing . confirmed, but from initial inspection they appear to be of clay hollow pot (or similar) construction. The second floor structure appears to be  【Get Price】

an assessment of the variation in construction duration between the

slabs and hollow core (Pre cast or Pre stressed). 2.1 CONSTRUCTION METHODS of CAST. IN-SITU FLOOR SYSTEM. Generally, the on-site construction method of any cast in-situ floor slabs could be summarized as follows: Construction of formwork, Placing of reinforcements, Pouring of concrete or casting and removal of formwork (Rupasinghe & Nolan, 2007); under these four steps, the construction process of monolithic solid slab and hollow clay pot slab will be examined. 【Get Price】